Call us now ! Send us an email http://maps.google.com/maps?q=924 Westpoint Pkwy Westlake United States

Back to Top

Call Us Today!
(440) 899-1661
Call Us Today!
(440) 899-1661

About Us

Company History and Experience
Peller & Associates, Inc., a Sub-S Corporation established in May of 1995, has extensive experience and is considered by many clients, including many repeat clients, to be one of the foremost structural engineering firms in the design of projects with complex and unusual applications including many nationally and internationally known first-class facilities. Our projects range from large multi-million dollar to small additions and remodels. Peller & Associates, Inc.’s ability to adapt to a specific project size and scope allows our clients to receive personal attention to each project’s specific needs. Our team of highly qualified professionals is committed to completing our assignments on time and within budget while meeting project objectives.
Sustainable Design Practices
Miklos Peller, Sr. P.E. has been on the forefront of Sustainable Design even before it became
common practice. A brief sample of those projects include:

Westinghouse Steam Turbine Division North American Headquarters in Orlando,
Florida.

  • The building has the shape of a segment of a curved ring, its axial radius of curvature being 440 feet. The building measures 163.5 feet x 612.5 feet and contains 257,500 square feet. The four floors are staggered outward to shade exterior fenestration.
  • The structure consisted of a paired column and post system to facilitate integration among structure lighting and mechanical components. The curve of the building’s planform is uniform for uniformity of forming. Exterior walls are white painted deck.
Shure Industries Corporate Headquarters in Niles, Illinois.
  • This architecturally exposed concrete and steel building was designed to emphasize engineering performance rather than design and style. The skin of the 239,000 square-foot building modulates its own climate resulting in a building of high technology and low energy costs that also meets an “eco-tech” approach.
Recently Completed Near West Theatre at the Gordon Square Art District in
Cleveland, Ohio.

  • A super-energy efficient design, incorporating Passivhaus design elements, including solar panels and extra thick walls for insulation.
  • The term passive house (Passivhaus in German) refers to a rigorous, voluntary standard for energy efficiency in a building, reducing its ecological footprint. It results in ultralow energy buildings that require little energy for space heating or cooling. A similar standard, MINERGIE-P, is used in Switzerland. The standard is not confined to residential properties; several office buildings, schools, kindergartens and a supermarket have also been constructed to the standard. Passive design is not an attachment or supplement to architectural design, but a design process that is integrated with architectural design. Although it is mostly applied to new buildings, it has also been used for refurbishments.
  • Numerous projects, both in the public and private sector, that are LEED Certified or LEED Certifiable.
Recently Completed Project that Utilized E-Builder software for Document and Schedule Management.
Ripley’s Aquarium of Canada ($120,000,000.00 CAD) completed October 2013.
  • Ripley’s Aquarium of Canada is a 12,500 square-meter (135,000 square-feet), $120,000,000.00 (CAD) world-class family attraction with more than 5.7 million liters (1.5 million gallons) of water depicting saltwater and freshwater habitats from around the world. This world class facility opened to the public on October 16, 2013.
  • Peller & Associates, Inc. was involved, in this state-of-the-art project, as associate structural engineers responsible for the design of the architecturally exposed concrete exterior, foundation, all the concrete exhibits and the upper level concrete including many exhibits and had to work alongside the structural engineer responsible for the remainder of the  building.
Peller & Associates, Inc. has participated in project with various project delivery
methods, including, but not limited to, the following:

  • Design Build
  • Integrated Project Delivery – Like
  • Construction Manager At Risk
  • Construction Manger as Advisor
  • General Contractor
Assistance with tracking project cost:
Peller & Associates, Inc. submits a cost estimate and design narrative at each design phases
for many of the projects. In the event, the cost appears different than what was budgeted we
brainstorm for alternate solutions.
Collaboration with other structural engineers:
The following project required us to collaborate with another structural engineering firm:
  • Ripley’s Aquarium of Canada (All Concrete structures were by our firm and the
  • remaining portions of the project were by Entuitive Engineers of Toronto, Canada.
  • CWRU/Thinkbox Innovation Center Renovation and addition (Addition by our firm and
  • renovation by Other firm)
  • Ripley’s Aquarium of Niagara Falls in Canada.
  • Malaysia Waterpark
  • Brazil Aquarium
A brief sample of projects, by our firm, that utilized the design/build project delivery
method:

  • Taft Technology Center in Youngstown, Ohio
  • New Otto and Fran Walter Music Hall at Muskingum University in New Concord, Ohio.
  • New World Headquarters for Shure Industries in Niles, Illinois.
  • Reconstruction of the Turtle Farm Park in the Grand Cayman Islands.
  • Kent State University/MACC Gymnasium 2016 Addition
Brief sample of projects, by our firm, that utilized the CM At Risk project delivery method:
  • Kent State University/Tri-Towers Renovation (Utilized OAS-CI for document management.
  • New Visual Arts Center at Seton Hill University
  • New Near West Theatre at the Detroit-Shoreway District in Cleveland, Ohio.
  • New Aquarium in Toronto, Canada ($80,000,000.00 USD).
  • Rehabilitation of the Penguin Habitat including the addition of a include a first of its kind trackless dark ride in Orlando, Florida ($70,000,000.00)
  • New Brooklyn K-7 School in Brooklyn, Ohio
  • St. Martin De Porres High School Addition and Renovations in Cleveland, Ohio.
Current Regional Projects Include:
  • Addition and Renovation to St. Martin De Porres. Architects: Fielding Nair International and Studio Techne Architects.
  • New K-7 School In Brooklyn, Ohio. Architect: Thendesign Architects of Willoughby
  • Mentor Professional Development Center in Mentor, Ohio. Architect: Thendesign
Architects of Willoughby
A sample project where we were prime to the owner and had a budget under $1,000,000.00 and utilized the General Contracting Delivery Method:
- YSU/TOD Hall 2009 Addition and Renovation in Youngstown, Ohio.
Some of the School Districts we have performed work for include:
  • Revere School District – 1995 Renovations
  • Ravenna Local School District
  • Geneva Area School District
  • Avon City School District
  • Vermillion Local School District
  • Olmsted Falls Local School District
  • Youngstown City School District
  • Niles Local School District
  • Cleveland Metropolitan School District – Segments 3, 4 and 7.
Recently completed inclusion project for the Federal Government:
Wright Patterson Airforce Base Renovations – Task Order 16 in Dayton, Ohio. (Contracted with H2L1 Consulting Engineers)
Current Projects Include:
New Harper and Booker K-8 Schools for CMSD Segment 7
Kent State University MACC Gym Addition and Renovation
Business Structure:
Miklos Peller, Sr. as Design Principal and Miklos Peller, Jr. as Managing Principal as well as a
highly qualified professional staff who are experienced, energetic and ready to take on a new
challenge.
Recently completed school projects Include:
New Middle School in Avon, Ohio.
New Sears Thinkbox Innovation Center for Case Western Reserve University.
Staff Composition:
Our firm has high-speed Internet service available 24 hours a day and uses Auto Cad, RISA 3-D
and Microsoft Office, Bluebeam, E-Builder and several other programs. Peller & Associates, Inc. is an equal opportunity employer and does not discriminate based on race, gender, religion or nation of origin.
Our Errors & Omissions coverage is as follows: $2,000,000.00 per claim/$2,000,000.00 aggregate.

Additional Email: mikpeller@aol.com

Portfolio Gallery

Call Us Today At ♦ (440) 899-1661

YP Reviews

Address

Peller & Associates, Inc.
924 Westpoint Pkwy
Westlake, OH 44145
Phone: (440) 899-1661
Email: mgpeller@pellerandassociates.com

In Business Since 1995

Business Hours

Mon - Fri: 09:00 AM - 04:00 PM
Sat - Sun: Closed
Appointments Available

Payment Options